With shortened bits of flashings made especially for the eves, we had to look at how we were to cut and set them so the sat flush up against the facia (all bits like this arent the same so thinking on top of your head is needed) We had to measure down how far and how much along then put that onto the flashing and check it out. Once done, we had to run a flat flashing from the top of the roof down to the bottom (new regulation) this stops any moisture from entering. Before it was lifted up, the tex screws had to come out where it was going to sit. Liftinf it up (being careful) we laid it down and went through and marked where the tex screws were to go. 100mm regulations for the over/under lap